PBIR Drift event Sept 24th

Well I've got exactly 23 days to get a 5.0 in the rx7, good thing its a super easy swap.

shhiiiiiit, everytime i do ANY work on a car and I say that it'll be easy.... some shit breaks/fucks up and it goes from 20min to 2 hour job...

GL
 
should only take like 3 days max if you can fab and have a shop lined up to make the driveshaft

I was going to make everything myself then someone post a grannyspeed mount kit and driveshaft on norotors.com for $300 bucks, so basically I'm waiting on a clutch, and I'll probably do some preventive maintenance while its out: water & oil pump, rear main seals, and stuff. I hear its literally like 5 wires to get it running after that.
 
i thought the final meeting was supposed to be yesterday to determine whether or not the event will happen..

anyone?
 
I was going to make everything myself then someone post a grannyspeed mount kit and driveshaft on norotors.com for $300 bucks, so basically I'm waiting on a clutch, and I'll probably do some preventive maintenance while its out: water & oil pump, rear main seals, and stuff. I hear its literally like 5 wires to get it running after that.

if i remember right its 6 takes about 5 mins
 
Back
Top Bottom