Moroso is Tore up!

heres some more, plus theres a bunch posted on moroso's site

http://www.racemoroso.com/index.php?option=com_gallery2&Itemid=128&g2_itemId=3127

The progress is still going strong.

DRAG STRIP - The concrete pouring for the 1/4 mile portion of the track should be finished this week. Then the pouring of concrete for the shutdown will continue. YES CONCRETE SHUTDOWN. No more transitions.

ROAD COURSE - The grading is done. The curbing and barriers are going up.


Where staging lanes will be

mmp14.jpg


From under the tower

mmp9.jpg

mmp1.jpg


From the end of the current wall to the tower

mmp11.jpg


From 1/4 toward the end of the track - New light poles are in. The new walls to the end of the track is starting to go Yes there will be a wall on the right side.

mmp2.jpg

mmp12.jpg


The return road.

mmp10.jpg


From The end of the track


mmp4.jpg

mmp3.jpg

mmp13.jpg


Road Course

mmp5.jpg

mmp6.jpg

mmp7.jpg

mmp8.jpg
 
Hell fuckin yea dude. When I went out there the other day, I was wondering about the Curbing on the inside of that turn. Is it going to be a curb or bump strips?
 
...

From under the tower

mmp1-1.jpg



From the roof of the tower

mmp2-1.jpg


mmp3-1.jpg



From about 100 feet past the stripe. The new left wall is up all the way to the end of the track. The right wall framing is starting to be put together.

mmp5-1.jpg



From about 1200 past the stripe in the shutdown.

mmp6-1.jpg



From the end of the track. Cap on the left lane wall is for where the road course is coming out of their turn. Right lane wall is beginning.

mmp7-1.jpg



Return road paved. Just across from the light pole on the right will be the location of the scale.

mmp4-1.jpg
 